53
53
Jun 13, 2021
06/21
by
KNTV
tv
eye 53
favorite 0
quote 0
they're on folsom street. they've been open, they are open 'cause these are essential services.'ll be back with consul of mexico in san francisco, stay with us. ♪♪♪ consul remedios gomez arnau of the consulate of mexico in san francisco. another topic we wanna talk about is the renaming of the biblioteca octavio paz. tell us what that means. remedios: yeah, on last april 19 we named our library octavio paz, why? well, he's a nobel prize of literature from mexico, the only nobel prize literature from our country and he was someone that came here to san francisco. he studied at berkeley university but very important, he was member of the mexican consulate. that was in the 1940s and he began working here as a local employee and then he became a member of thewas very impord remind everyone that he was here and that's why we named our library at the consulate octavio paz. damian: all right, we do have some final video that we wanna show, just at the consulate when things were normal, but we wanna show you some of that as well. what is it, consul, about the bay area, because you're ta
they're on folsom street. they've been open, they are open 'cause these are essential services.'ll be back with consul of mexico in san francisco, stay with us. ♪♪♪ consul remedios gomez arnau of the consulate of mexico in san francisco. another topic we wanna talk about is the renaming of the biblioteca octavio paz. tell us what that means. remedios: yeah, on last april 19 we named our library octavio paz, why? well, he's a nobel prize of literature from mexico, the only nobel prize...
SFGTV: San Francisco Government Television
31
31
Jun 1, 2021
06/21
by
SFGTV
tv
eye 31
favorite 0
quote 0
roof without being on a real roof before we go into a building and prothat, so that's also on folsom street. we practiced the engine class, which is the class for a [inaudible] to take an engine on a job. they're back practicing skills, and they're very happy to be able to do that, especially with the new academy. they're there. commissioner feinstein, you almost made it to this. occasionally, we get some structures that members of the public will offer to us for demo before their remodelling purposes, and through the real estate department and us, we were able to sign agreements that we can use it, practicing our skills. in this case, we're practicing our ventilation skills, and securing a victim from the roof, so it's very helpful to do it on actual structures, so i want to commend them to that and the training team, the effort that they did to put this together. our effort continues to do drills, focus on some medical training, c.p.r. training, critical care transport training so they continue to do the required drills. this is the time of year, even though wild land fire season has star
roof without being on a real roof before we go into a building and prothat, so that's also on folsom street. we practiced the engine class, which is the class for a [inaudible] to take an engine on a job. they're back practicing skills, and they're very happy to be able to do that, especially with the new academy. they're there. commissioner feinstein, you almost made it to this. occasionally, we get some structures that members of the public will offer to us for demo before their remodelling...
SFGTV: San Francisco Government Television
12
12
Jun 5, 2021
06/21
by
SFGTV
tv
eye 12
favorite 0
quote 0
with that follow-up campaign phase, we'll be looking to extend south from folsom to bryant street. quickly summarizing those two planned phases for central embarcadero. we are actively looking to implement the quick build if it's approved later this year or early next. we're going to be coordinating with p.u.c. project that is already on the corridor now doing construction activity hoping when they finish up, we'll be able to put down our project design so that we're minimizing disruption to the corridor. we're actively engaged with the sfcta in seeking funding of that phase of the project. using prop k sales tax dollars. the follow-up capital phase, we anticipate, we're estimating about $5 million capital project with $1 million to $2 million in detail stein. we're actively looking to jump start the detailed design phase while we're implementing and evaluating the quick build phase. we're trueing to move as -- we're trying omove as quickly as we can. i alluded to years of outreach. that has helped provide strong foundation for our work today. since about january, we've been very a
with that follow-up campaign phase, we'll be looking to extend south from folsom to bryant street. quickly summarizing those two planned phases for central embarcadero. we are actively looking to implement the quick build if it's approved later this year or early next. we're going to be coordinating with p.u.c. project that is already on the corridor now doing construction activity hoping when they finish up, we'll be able to put down our project design so that we're minimizing disruption to...
SFGTV: San Francisco Government Television
27
27
Jun 7, 2021
06/21
by
SFGTV
tv
eye 27
favorite 0
quote 0
with that follow-up campaign phase, we'll be looking to extend south from folsom to bryant street. quickly summarizing those two planned phases for central embarcadero. we are actively looking to implement the quick build if it's approved later this year or early next. we're going to be coordinating with p.u.c. project that is already on the corridor now doing construction activity hoping when they finish up, we'll be able to put down our project design so that we're minimizing disruption to the corridor. we're actively engaged with the sfcta in seeking funding of that phase of the project. using prop k sales tax dollars. the follow-up capital phase, we anticipate, we're estimating about $5 million capital project with $1 million to $2 million in detail stein. we're actively looking to jump start the detailed design phase while we're implementing and evaluating the quick build phase. we're trueing to move as -- we're trying omove as quickly as we can. i alluded to years of outreach. that has helped provide strong foundation for our work today. since about january, we've been very a
with that follow-up campaign phase, we'll be looking to extend south from folsom to bryant street. quickly summarizing those two planned phases for central embarcadero. we are actively looking to implement the quick build if it's approved later this year or early next. we're going to be coordinating with p.u.c. project that is already on the corridor now doing construction activity hoping when they finish up, we'll be able to put down our project design so that we're minimizing disruption to...
SFGTV: San Francisco Government Television
15
15
Jun 8, 2021
06/21
by
SFGTV
tv
eye 15
favorite 0
quote 0
it came out over 15 years ago when we were talking about making howard street and folsom street two waystreets and increasing the width of the sidewalk so we would have many parks on that. it has been a long time. it is a great idea for open space and everybody. and the way we have all these proposals. >> thank you for your comments. you will have one minute. >> i am a district nine resident. i am a supporter of small businesses. it breaks my heart to listen to all the comments from the small business owners who called in sharing their strife. i want to see that shared spaces contribute to my survival and well-being during the dreaded pandemic and having this better use of a vehicle space will help our small businesses thrive and add to the vitality of our neighborhood. i am supporting my good friend in the mission. it has been a doozy. we should be rewarding the small businesses because they became front line hospitality workers in the midst of the pandemic. it is vital to their survival and recovery. i trust our small business owners to make small businesses wonderful for the communit
it came out over 15 years ago when we were talking about making howard street and folsom street two waystreets and increasing the width of the sidewalk so we would have many parks on that. it has been a long time. it is a great idea for open space and everybody. and the way we have all these proposals. >> thank you for your comments. you will have one minute. >> i am a district nine resident. i am a supporter of small businesses. it breaks my heart to listen to all the comments from...
SFGTV: San Francisco Government Television
49
49
Jun 30, 2021
06/21
by
SFGTV
tv
eye 49
favorite 0
quote 0
please play the video in support of our project at 260 folsom street.nk you. >> clerk: thank you, we'll cue up the video in a moment. i think the speaker said this is for youth speaks. >> caller: that's correct. >> clerk: we're going to be calling that up from the rest of the videos. it will be a moment please. [video] >> they say allowing youth to say whatever they want is dangerous. >> they are wrong. they said it wasn't >> supervisor safai: for young people to speak out against injustice. >> that puts them in harms way. >> we couldn't disagree more. >> my song is fading, we are in a state of emergency. >> here we are, one year later and one block away from youth speaks again, 25 years ago. 127 units of affordable housing through the power of the art, the power of stories and the power of us. >> even with the barriers broken, >> time to take up more space. >> celebrate 25 years of youth speak and help us plan for 25 more. >> clerk: was that the end of the presentation that we received from youth speak? it appears so. thank you very much for bringing u
please play the video in support of our project at 260 folsom street.nk you. >> clerk: thank you, we'll cue up the video in a moment. i think the speaker said this is for youth speaks. >> caller: that's correct. >> clerk: we're going to be calling that up from the rest of the videos. it will be a moment please. [video] >> they say allowing youth to say whatever they want is dangerous. >> they are wrong. they said it wasn't >> supervisor safai: for young...
SFGTV: San Francisco Government Television
50
50
Jun 12, 2021
06/21
by
SFGTV
tv
eye 50
favorite 0
quote 0
we have one housekeeping items appeal 21035 and folsom street would like to the matter continued. we need a motion. >> we need a motion and vote. >> i'll make a motion. >> is there public comment on the motion to continue the item? if so raise your right hand. i don't see hands raised. on the motion to continue the item to june 23, commissioners lazarus? >> aye. >> vice president swig. >> aye. >> the motion carries and the matter is continued. we will now move on to item number 1 general public comment. an opportunity for anyone who wishes to speak on a matter within the board's distribution not on tonight's calendar. is there anyone who wishes to speak on an item not on tonight's agenda, if so please raise your hand. i don't see hands raised. so we will move on to item 3 the adoption of minutes. the commission is before for possible adoption for the june 2, 2021. >> do we have changes or additions may we have a motion? >> motion to adopt. >> is there public comment on the motion to adopt the minutes? raise your hand. i see one hand raised. >> caller: i would like to amend appeal
we have one housekeeping items appeal 21035 and folsom street would like to the matter continued. we need a motion. >> we need a motion and vote. >> i'll make a motion. >> is there public comment on the motion to continue the item? if so raise your right hand. i don't see hands raised. on the motion to continue the item to june 23, commissioners lazarus? >> aye. >> vice president swig. >> aye. >> the motion carries and the matter is continued. we will...
SFGTV: San Francisco Government Television
28
28
Jun 7, 2021
06/21
by
SFGTV
tv
eye 28
favorite 0
quote 0
roof without being on a real roof before we go into a building and prothat, so that's also on folsom street. we practiced the engine class, which is the class for a [inaudible] to take an engine on a job. they're back practicing skills, and they're very happy to be able to do that, especially with the new academy. they're there. commissioner feinstein, you almost made it to this. occasionally, we get some structures that members of the public will offer to us for demo before their remodelling purposes, and through the real estate department and us, we were able to sign agreements that we can use it, practicing our skills. in this case, we're practicing our ventilation skills, and securing a victim from the roof, so it's very helpful to do it on actual structures, so i want to commend them to that and the training team, the effort that they did to put this together. our effort continues to do drills, focus on some medical training, c.p.r. training, critical care transport training so they continue to do the required drills. this is the time of year, even though wild land fire season has star
roof without being on a real roof before we go into a building and prothat, so that's also on folsom street. we practiced the engine class, which is the class for a [inaudible] to take an engine on a job. they're back practicing skills, and they're very happy to be able to do that, especially with the new academy. they're there. commissioner feinstein, you almost made it to this. occasionally, we get some structures that members of the public will offer to us for demo before their remodelling...
SFGTV: San Francisco Government Television
37
37
Jun 13, 2021
06/21
by
SFGTV
tv
eye 37
favorite 0
quote 0
we have one housekeeping items appeal 21035 and folsom street would like to the matter continued. we need a motion. >> we need a motion and vote. >> i'll make a motion. >> is there public comment on the motion to continue the item? if so raise your right hand. i don't see hands raised. on the motion to continue the item to june 23, commissioners lazarus? >> aye. >> vice president swig. >> aye. >> the motion carries and the matter is continued. we will now move on to item number 1 general public comment. an opportunity for anyone who wishes to speak on a matter within the board's distribution not on tonight's calendar. is there anyone who wishes to speak on an item not on tonight's agenda, if so please raise your hand. i don't see hands raised. so we will move on to item 3 the adoption of minutes. the commission is before for possible adoption for the june 2, 2021. >> do we have changes or additions may we have a motion? >> motion to adopt. >> is there public comment on the motion to adopt the minutes? raise your hand. i see one hand raised. >> caller: i would like to amend appeal
we have one housekeeping items appeal 21035 and folsom street would like to the matter continued. we need a motion. >> we need a motion and vote. >> i'll make a motion. >> is there public comment on the motion to continue the item? if so raise your right hand. i don't see hands raised. on the motion to continue the item to june 23, commissioners lazarus? >> aye. >> vice president swig. >> aye. >> the motion carries and the matter is continued. we will...
SFGTV: San Francisco Government Television
48
48
Jun 28, 2021
06/21
by
SFGTV
tv
eye 48
favorite 0
quote 0
please play the video in support of our project at 260 folsom street.nk you. >> clerk: thank you, we'll cue up the video in a moment. i think the speaker said this is for youth speaks. >> caller: that's correct. >> clerk: we're going to be calling that up from the rest of the videos. it will be a moment please. [video] >> they say allowing youth to say whatever they want is dangerous. >> they are wrong. they said it wasn't >> supervisor safai: for young people to speak out against injustice. >> that puts them in harms way. >> we couldn't disagree more. >> my song is fading, we are in a state of emergency. >> here we are, one year later and one block away from youth speaks again, 25 years ago. 127 units of affordable housing through the power of the art, the power of stories and the power of us. >> even with the barriers broken, >> time to take up more space. >> celebrate 25 years of youth speak and help us plan for 25 more. >> clerk: was that the end of the presentation that we received from youth speak? it appears so. thank you very much for bringing u
please play the video in support of our project at 260 folsom street.nk you. >> clerk: thank you, we'll cue up the video in a moment. i think the speaker said this is for youth speaks. >> caller: that's correct. >> clerk: we're going to be calling that up from the rest of the videos. it will be a moment please. [video] >> they say allowing youth to say whatever they want is dangerous. >> they are wrong. they said it wasn't >> supervisor safai: for young...
SFGTV: San Francisco Government Television
57
57
Jun 8, 2021
06/21
by
SFGTV
tv
eye 57
favorite 0
quote 0
it came out over 15 years ago when we were talking about making howard street and folsom street two waystreets and increasing the width of the sidewalk so we would have many parks on that. it has been a long time. it is a great idea for open space and everybody. and the way we have all these proposals. >> thank you for your comments. you will have one minute. >> i am a district nine resident. i am a supporter of small businesses. it breaks my heart to listen to all the comments from the small business owners who called in sharing their strife. i want to see that shared spaces contribute to my survival and well-being during the dreaded pandemic and having this better use of a vehicle space will help our small businesses thrive and add to the vitality of our neighborhood. i am supporting my good friend in the mission. it has been a doozy. we should be rewarding the small businesses because they became front line hospitality workers in the midst of the pandemic. it is vital to their survival and recovery. i trust our small business owners to make small businesses wonderful for the communit
it came out over 15 years ago when we were talking about making howard street and folsom street two waystreets and increasing the width of the sidewalk so we would have many parks on that. it has been a long time. it is a great idea for open space and everybody. and the way we have all these proposals. >> thank you for your comments. you will have one minute. >> i am a district nine resident. i am a supporter of small businesses. it breaks my heart to listen to all the comments from...
SFGTV: San Francisco Government Television
47
47
Jun 2, 2021
06/21
by
SFGTV
tv
eye 47
favorite 0
quote 0
as shown here, the temporary terminal site is 3.5 acres bounded by howard, folsom, main and beal streets. connists of blocks 2, 3, 4 in zone one you of the redevelopment plan area ultimately planned for affordable housing, public park and mixed income housing respectively beginning in 2023. in 2008 the transbay joint powers authority purchased the site improved for trans it is term nat use paving, three buildings and bus terminal and seating. this use ended in late 2019. the site will otherwise be vacant until permanent construction begins. the surrounding community has expressed interest in seeing beneficial interim activation of the site until permit construction starts. in august 2020 you authorized ocii to acquire from tjpa which was completed in january of this year. in response to community interest. we issued request for proposals for temporary activation in december 2020. i will pass on page for discussion of the r.f.p. process. >> thank you, aaron. good afternoon, commissioners. december 2020 we released r.f.p. for interim activation. it sought team to manage and activation uses
as shown here, the temporary terminal site is 3.5 acres bounded by howard, folsom, main and beal streets. connists of blocks 2, 3, 4 in zone one you of the redevelopment plan area ultimately planned for affordable housing, public park and mixed income housing respectively beginning in 2023. in 2008 the transbay joint powers authority purchased the site improved for trans it is term nat use paving, three buildings and bus terminal and seating. this use ended in late 2019. the site will otherwise...
SFGTV: San Francisco Government Television
27
27
Jun 5, 2021
06/21
by
SFGTV
tv
eye 27
favorite 0
quote 0
as shown here, the temporary terminal site is 3.5 acres bounded by howard, folsom, main and beal streets. connists of blocks 2, 3, 4 in zone one you of the redevelopment plan area ultimately planned for affordable housing, public park and mixed income housing respectively beginning in 2023. in 2008 the transbay joint powers authority purchased the site improved for trans it is term nat use paving, three buildings and bus terminal and seating. this use ended in late 2019. the site will otherwise be vacant until permanent construction begins. the surrounding community has expressed interest in seeing beneficial interim activation of the site until permit construction starts. in august 2020 you authorized ocii to acquire from tjpa which was completed in january of this year. in response to community interest. we issued request for proposals for temporary activation in december 2020. i will pass on page for discussion of the r.f.p. process. >> thank you, aaron. good afternoon, commissioners. december 2020 we released r.f.p. for interim activation. it sought team to manage and activation uses
as shown here, the temporary terminal site is 3.5 acres bounded by howard, folsom, main and beal streets. connists of blocks 2, 3, 4 in zone one you of the redevelopment plan area ultimately planned for affordable housing, public park and mixed income housing respectively beginning in 2023. in 2008 the transbay joint powers authority purchased the site improved for trans it is term nat use paving, three buildings and bus terminal and seating. this use ended in late 2019. the site will otherwise...
SFGTV: San Francisco Government Television
38
38
Jun 7, 2021
06/21
by
SFGTV
tv
eye 38
favorite 0
quote 0
as shown here, the temporary terminal site is 3.5 acres bounded by howard, folsom, main and beal streets. connists of blocks 2, 3, 4 in zone one you of the redevelopment plan area ultimately planned for affordable housing, public park and mixed income housing respectively beginning in 2023. in 2008 the transbay joint powers authority purchased the site improved for trans it is term nat use paving, three buildings and bus terminal and seating. this use ended in late 2019. the site will otherwise be vacant until permanent construction begins. the surrounding community has expressed interest in seeing beneficial interim activation of the site until permit construction starts. in august 2020 you authorized ocii to acquire from tjpa which was completed in january of this year. in response to community interest. we issued request for proposals for temporary activation in december 2020. i will pass on page for discussion of the r.f.p. process. >> thank you, aaron. good afternoon, commissioners. december 2020 we released r.f.p. for interim activation. it sought team to manage and activation uses
as shown here, the temporary terminal site is 3.5 acres bounded by howard, folsom, main and beal streets. connists of blocks 2, 3, 4 in zone one you of the redevelopment plan area ultimately planned for affordable housing, public park and mixed income housing respectively beginning in 2023. in 2008 the transbay joint powers authority purchased the site improved for trans it is term nat use paving, three buildings and bus terminal and seating. this use ended in late 2019. the site will otherwise...
SFGTV: San Francisco Government Television
38
38
Jun 1, 2021
06/21
by
SFGTV
tv
eye 38
favorite 0
quote 0
as shown here, the temporary terminal site is 3.5 acres bounded by howard, folsom, main and beal streets. connists of blocks 2, 3, 4 in zone one you of the redevelopment plan area ultimately planned for affordable housing, public park and mixed income housing respectively beginning in 2023. in 2008 the transbay joint powers authority purchased the site improved for trans it is term nat use paving, three buildings and bus terminal and seating. this use ended in late 2019. the site will otherwise be vacant until permanent construction begins. the surrounding community has expressed interest in seeing beneficial interim activation of the site until permit construction starts. in august 2020 you authorized ocii to acquire from tjpa which was completed in january of this year. in response to community interest. we issued request for proposals for temporary activation in december 2020. i will pass on page for discussion of the r.f.p. process. >> thank you, aaron. good afternoon, commissioners. december 2020 we released r.f.p. for interim activation. it sought team to manage and activation uses
as shown here, the temporary terminal site is 3.5 acres bounded by howard, folsom, main and beal streets. connists of blocks 2, 3, 4 in zone one you of the redevelopment plan area ultimately planned for affordable housing, public park and mixed income housing respectively beginning in 2023. in 2008 the transbay joint powers authority purchased the site improved for trans it is term nat use paving, three buildings and bus terminal and seating. this use ended in late 2019. the site will otherwise...
66
66
Jun 3, 2021
06/21
by
KRON
tv
eye 66
favorite 0
quote 0
folsom. and i'm james fletcher and it is not so good morning for folks out in fremont right now, especially out of the warren street off-ramp. >> just off tee. >> a lot of trash. yeah. it stinks out their covers. the evans has been watching them pick up trash all morning long apparently they've just changed tactics in clearing this mass killing. >> yeah, they did. they realize that the walls of the of this container or compromise. so they're trying to take out all the garbage and now they're bringing out dump so that they could transfer into over drugs that struck number one, they have another drug that's trying to come in. >> to take care of the rest of the garbage. well, they're going to happen. take out the garbage for them up right. truck about this happened around 3.15 in the morning. the police officers got the call when they got here, there was no driver. he was missing, but a witness did say that the driver kicked out the cab window and was able to climb out and then got into another car and drove off. and since they've that been out here because this is caltrans. action it is basically dominating the on th
folsom. and i'm james fletcher and it is not so good morning for folks out in fremont right now, especially out of the warren street off-ramp. >> just off tee. >> a lot of trash. yeah. it stinks out their covers. the evans has been watching them pick up trash all morning long apparently they've just changed tactics in clearing this mass killing. >> yeah, they did. they realize that the walls of the of this container or compromise. so they're trying to take out all the garbage...
91
91
Jun 3, 2021
06/21
by
KRON
tv
eye 91
favorite 0
quote 0
folsom. and i'm james fletcher and it is not so good morning for folks out in fremont right now, especially out of the warren streetot of trash. yeah. it stinks out their covers. the evans has been watching them pick up trash all morning long apparently they've just changed tactics in clearing this mass killing. >> yeah, they did. they realize that the walls of the of this container or compromise. so they're trying to take out all the garbage and now they're bringing out dump so that they could transfer into over drugs that struck number one, they have another drug that's trying to come in. >> to take care of the rest of the garbage. well, they're going to happen. take out the garbage for them up right. truck about this happened around 3.15 in the morning. e
folsom. and i'm james fletcher and it is not so good morning for folks out in fremont right now, especially out of the warren streetot of trash. yeah. it stinks out their covers. the evans has been watching them pick up trash all morning long apparently they've just changed tactics in clearing this mass killing. >> yeah, they did. they realize that the walls of the of this container or compromise. so they're trying to take out all the garbage and now they're bringing out dump so that they...