so the next image is down on fradell near the pocket park. here we step the massing of the building in and out as well as up and down. we articulated the corner. that was another comment from the community to kind of erode the corner there at the park. and then introduce some color accent on the project. also the windows step up and down and shift horizontally. and then the final images of you from donahue and kirk wood, we had the bays along donahue, we have stooped along that street so people can enter their unit along the sidewalk to activate the edge which is a requirement for the d for d and then we've introduced sun shades on this as well as a portion of the frydale. it provides shadow for those units facing this west orientation. i have a couple material boards up here that i can pass around later after the presentation but basically the materials on the building are painted a cement board panels, painted horizontal citing, we have some board form concrete as you can see in this image. the metal is a warm metal that we're using on the