i am here today with gane eriksson, the consulting engineers. i'm also here with eric lands from the consulting firm. the approval of the cep will permit at&t to remove the two existing antennas on the building and replace them with seven panel antennas. the necessary equipment will be located on the ground floor any breezeway to the south of the property. the site is a mixed use building. as outlined in the material, at&t conducted an alternative site analysis. nine sites were chosen and evaluated in the surrounding area by our radiofrequency engineers. the site is necessary for at&t to close a coverage gap in its wireless network, as explained in detail in your packets. i will thank rick crawford and the planning staff for helping us to direct and design this location. we ask for your support as we continue to diligently upgrade our network here in san francisco to meet the needs of the wireless telecommunication needs. we're happy to answer any questions you might have. president fong: thank you. public comment? >> good afternoon, commissione