director goldstein: will call item 4a, gebresilassie vs. mtad at that time, the board voted 5-0 to grant the appeal, overall the denial, and issue the taxi medallion. they are in agreement with the findings as drafted. they are both here if you have any questions. president goh: i will move the adoption of these. secretary pacheco: on the motion to adopt these findings, commissioner fung, vice president garcia, commissioner peterson, commissioner hwang, the vote is 5-0, those findings are adopted. director goldstein: a building permit application, and its variance granted on july 21, 2010, and the building permit was issued in 2011. the variance is on presidio. it is for a rear yard and noncompliance structure, and the building permit is to demolish the rear wing, at the stairs and elevators, reconfigure the north, east, and south sides of the roof, the elevator shaft, two dormers, and windows.