you have this gap to the east west connection to u.s. 101 this is the geneva the brt project that provides sdrathd rules of evidence and improves the traffic times on this east west connection are that with that project the second component is happening between bayshore billboard that references the geneva extension that is basically project c on the map and there are several different alignment options from bayshore boulevard to u.s. 101 that alignment is driven or a function of the brisbane development so depending on that outcome whether the alignment is the extension and how had worked. the third project that ties into this the bayshore caltrain station the vice president of the land use is looking at the relocation study with our participation. to consider northern and southern alternatives for the bayshore alignment that is driven by the land use projects in the area and how we want to connect them to the caltrain station. the third project that is highlighted is the t extension this is really not moving forwa forward little reasons why this loop or extension will happen goodwin on t