different project that was postponed solely at our discretion, it has in their objection to this plan, geven, that's not relevant the previous plan. the plan submitted for this current project indicated glass railings were approved. president olague: thank you. thanks. are there speakers in support of the project sponsor? dd seeing none, d.r. requester, you have two minutes for rebuttal. >> good afternoon, commissioners. i'm the architect. i was asked to look that the for the neighbor's plans. the first a much larger project that didn't go through. they did not -- they did not retain me, however, to look at the variance drawings. they felt they could read them accurately. and, again, on the overhead -- sorry. this was the drawing that the binellis received from the planning department showing a solid railing. essentially and very briefly, the request is really about the process of plans approval and whether a project sponsor can make changes to a project after a variance is approved. and come back with a different shrine or slightly different design. again, this is not a huge item in terms o