do not know permit new herriot's identified by local risk assessment as -- new areas identified by local risk assessment of the vulnerable unless certain criteria are met. those three criteria the project complies with our natural resources restoration project, underutilized land within an existing urbanized area served by transit or within the existing priority development areas. it will be served are robust transit and bus service to the issei as well as san francisco common and -- to the east side as well as san francisco, and finally through design and financial strategies. we do both. the next one is to develop fee level rise flood protection plans, utilize local risk assessment and innovation map to plan for sea level rise and include those in the safety element position and non- structural methods should be used. we have done this starting with the report, and as detailed in infrastructure plan, developed plans for initial improvement as well as long-term implementation strategy. we also comply with this, requirement that public access to the long term. this should require it to r