igor zelenaya energia is still producing in the murmansk region start of commercial operation of thea wind power plant 57 turbines are located in the most suitable place on the road to the ancient village of teriberka, where the elements can generate electricity all year round. this will reduce carbon dioxide emissions by 600,000 tons, to build the weight, it was necessary to carry out the most complex logistics operations ; giant structures and turbine blades, carried and sports on special platforms 80 km, appeared on the road through the hills on the spot, the equipment was collected. now the finished station occupies an area of 20 m², but the company assures that it will stand up to arctic temperatures. thank you anastasia let you go is preparing for the broadcast, but the remaining minute before the regional part is used to turn on ryazan elizaveta dorokhin already studios. good evening igor today, ryazan drivers temporarily gave way to cows , the police deliberately blocked the highway between two villages when the herd was driven to a grazing place. the fact is that in winter