generally call them inhuman temperatures, about -200. 53° in 2020, the cariagen plant supplied the indian space agencyquipment for two rocket engine test benches; in general, such cargo can take up to several years to reach the recipient from the moment the contract is concluded. this line was sent from balashikha to the river port of the moscow river, so that it would arrive via the water canal at the seaport of st. petersburg, and from there through the sued canal to the southern coast of india. in total, it took 108 days to complete this journey until installation on the foundations. it is necessary for testing the main equipment before an important event, the launch of a space rocket. through the gnp port there are two main routes to russia: the first - through the european ports in antwerp and rotterdam, to moscow and st. petersburg, the second, through the black sea, due to western sanctions against russia, we can use not only these routes, there are the eastern route, it is called the international north-south corridor, which runs to russia through iran, that is, from our port the cargo arrives