says the managing director of ergougol, inna vasyuk.n export nine times more, up to 18 million tons, but even with this figure, russian railways cannot cope with you. and if we have a project for 45 million, we need to ensure our carrying capacity, the private pacific railway will pass through two regions from the elgen coal mine in the republic of sakha yes, we are samoanor in the khabarovsk territory to the sea of okhotsk basin are building a track from two directions at once from the side of places birth and from the side of the coasts is severe and the more difficult the weather conditions, the more difficult the technical implementation of the railway project. today the river is calm and beautiful, but there were spring floods, when the level of this river rose to 5 m, this crossing. we restored several times, because they coped with the capacity of the pipes, which is laid down. she was at the facility, all these issues are resolved promptly, but in case they were completely cut off from the supply, they made reserves in advan