the author of the project, ivan zheltovsky, began working back in 1939, but because of the war, the projectbe frozen in a residential building at smolenskaya square, 11. 20/21 appeared only in 1951, but after 70 years one of the most beautiful buildings in the city fell into disrepair the house has been carried out, in general, a full range of works on the overhaul of zaisk. of course, this is excluding restoration work. there is also a major overhaul. this replacement of engineering systems was carried out in full. e, of course, the repair of the basement and, er, here , in addition to the restoration of the facades , work was carried out on the restoration of the entrances. in 2022, the work on the facades of the master was fully completed; they actually recreated the crowning cornice with its brackets and stucco decoration and breathed new life into the very the capital repair fund returns a memorable detail of the house - a small turret to the past greatness - and the entrance once the landings were decorated with chandeliers, carpets , furniture and even fireplaces. each of the lobbies