my name is jason chan, architect of the project. i just wanted to supplement some of the information we just talk about. >> president hillis: you want to turn that 90°? yeah, perfect. >> so this is the realized -- the storefront of the front building facing leland. so after we talked to the planner east, we make some change modifications filling up the hole. so we have a storefront door, and then we have -- [ inaudible ] -- so overall, looks like a storefront system in the front now. okay? and talking about a -- the rear two buildings, those are small building. only two story building. the total height is only 23'6". we don't even have a parapet wall on the roof. we have tried to minimize the roof of the between. and between the new wall and their neighbor's building, we have 66 feet, you know, distance between the two rear walls building, okay? and so we -- we spent lots of time working with the planning department come up with solution, the building design, to try to blend into the neighborhood, and so i think it's a good project