javier chavareia. as she discussed we have completed top graphic survey. a few small changes have occurred. when we went to the property to implement the required modifications to the plans, we noticed that the topographic conditions had changed. so, we recommended to have a survey done so, thus, our plans would reflect exactly what needs to be done. we have completed the survey. we are in the process of preparing the revised grading plan, and our drawings will be completed early next week. permit process should be fairly simple, as all the drawings have been previously approved under the previous schemes and the modifications that we're making are really not substantial from the structural or civil engineering standpoint. so far we don't foresee any problems obtaining the permit. when it comes to the execution of the program, we are approaching the rainy season. the construction of the retaining wall involves a substantial amount of excavation and modification. so, that's something that the two property owners are going to have to discuss because it will