jebeli , the radio survey in the same time frame compared to 1400 increased by 30. repairs in the country's thermal power plants. the thermal power company announced that the thermal power plants will be ready for the summer peak with 98 capacity to produce more than 51,000 megawatts. we had new units, the amount of production broke the record and there is also a point the larger volume of repairs that happened and in a shorter time, what was done normally in previous years , was that we had a defined repair season from the beginning of september to the end of june, which was a smaller amount of these repairs, for example , 97 thousand megawatts last year. on major repairs and before. we did it. this year , we were able to carry out these repairs in a shorter and more intensive time, in a shorter period of two months, and with the growth of nearly 6 to 7 thousand megawatts. four people , including a girl, were killed and 7 people were killed in the bombing of a house in the center of gaza city others, including several children, were injured. rifa city in the south.