jesse herzog, my project manager, will describe more about the construction process and why these trees pose a hazard. >> as eric was alluding to, this is a diagram of the job site that was created by web corps. and you can see above here. but the issue is, web corps was looking to utilize the staging area for hoisting of the large unitized components directly to the building. with the trees in that area, we no longer have -- or web corps will not have as direct of path to hoist. these are 20 by 20 panels of steel and glass that will be mounted to the building. any time there's more horizontal movement for those, you create issues of them hitting the trees or issues with wind and banging into the building which creates this hazard. additionally, without access to that staging area, we would be required to hoist the large panels from the street which would be bringing them over the pedestrian causeway. which creates also another issue in terms of the construction safety at the job site for both the public and also the construction workers on the site. additionally, there was one other co