. >> jill duffy dbi. the knowledge permit was a form three. that was taken for intake. it was filed on the eighth of july 2015. issued on the 20th of november 2017. it was reviewed as you heard. we had building plan checked. the fire department. it will be approved as well. it looks like code compliant. i don't see anything from building code issues that would be anything to worry about that i saw. in regards to the heights and the elevations and surveys. that is responsibility of the design professional. we will expect it was done professionally and that is where we are with that. obviously people do bring that type of thing up. it is sometimes prudent to get a survey done to make sure everything ask accurate. that is done by alonged surveyor. the most recent one was the garage permit that is signed off and cfc issued. i was involved in that. miss tsang was down to the departments and we made plans available and let her have comments. if she had complaints we addressed them. there was a cfc issued. there was a number of -- i counted 28 complaints on the property filed