. >> commissioners, i'm jim haas, i was a member of the r.a.b. working group, and as some of you recall, i appeared a number of times over the last decade about this project. and, of course, we were reaping what has -- what we sowed long ago by not paying attention to it. the basic problem was that the first executive director kept the project and the agency under wraps. she asserted it was not a city agency, and she did her best to keep the city out of the project, as some of you are well aware. including the mayor at the time. and so, you know, a lot of what went on occurred because nobody knew what was going on. there's an old expression that says, a power deserves scrutiny, not gratitude, and i think that your desire to change the bureaucracy around is not as important as developing a way to scrutinize what is going on. to open it up to the largest extent with technical and public involvement. so along with my colleagues worried about the time frame, i, too, would like to see some of the work continued and would rather than six months, 90 day