SFGTV: San Francisco Government Television
147
147
May 24, 2016
05/16
by
SFGTV
quote
eye 147
favorite 0
quote 1
at the table in front is senior building inspector joe duffy dbi providing the advice for the department of building inspection and joined when i scott sanchez the zoning administrator who will be representing planning department and planning commission and carli short the bureau of the department of public works as well as chris buck forecast with
at the table in front is senior building inspector joe duffy dbi providing the advice for the department of building inspection and joined when i scott sanchez the zoning administrator who will be representing planning department and planning commission and carli short the bureau of the department of public works as well as chris buck forecast with
SFGTV: San Francisco Government Television
48
48
May 1, 2016
05/16
by
SFGTV
tv
eye 48
favorite 0
quote 0
. >> good evening commissioners joe duffy dbi and ucsf last week he needed to, back to dbi and check we did the proper notification for structural work and we did indeed do the structural add notice that was sent out if i could have the overhead this is a printout of a characterizations from our permit tracking system this is an internal thing i checked generally have this with me doesn't have this last week. >> let's see there it is on the bottom it says structural notification yes, so- it was done and then we have a copy of the letter that was sent to the appellants by dbi overhead again are we done. >> face it in the same direction you'll look at it there we go. >> is that better yeah. this is a typical letter the data of letter on 21st of october 2015 we sent out 11 letters to different buildings around the property where the work was done so i got this in the central permit bureau i'm happy to report that was done and other thing i did a site visit this morning and all of the work seems to be as we normally see in a concrete foundation in sections looks to be done presidential f
. >> good evening commissioners joe duffy dbi and ucsf last week he needed to, back to dbi and check we did the proper notification for structural work and we did indeed do the structural add notice that was sent out if i could have the overhead this is a printout of a characterizations from our permit tracking system this is an internal thing i checked generally have this with me doesn't have this last week. >> let's see there it is on the bottom it says structural notification...
SFGTV: San Francisco Government Television
70
70
May 6, 2016
05/16
by
SFGTV
tv
eye 70
favorite 0
quote 0
had an excellent e excellent month and a lot of letters we want to recognize those people kari and joe duffy of the department of building inspection dan she thought plumbing received a letter of verifications that plumbing work was complete and the property passed inspection dennis of the housing inspection helpful for the communicating with the residents and the landlord at a property that resulted in a secure door installed so the building was happy a big deal for people that live there benny was k3450789 by conducting field inspectors on a construction being completed and satisfied with the the owner and tenant moving forward in quickly and finally we have as we do in our quarters the final announcement congratulations to benefiting i didn't who is there looking dapper and dressed for the occasion i thought he was going to a wedding when i saw him nominated for deputy director employee quarter of 2016 and to the employee recognize committee met last week on inspector kern responding to the two 46 situation for a single-family home was sliding down a sleeping slope on the backside of moun
had an excellent e excellent month and a lot of letters we want to recognize those people kari and joe duffy of the department of building inspection dan she thought plumbing received a letter of verifications that plumbing work was complete and the property passed inspection dennis of the housing inspection helpful for the communicating with the residents and the landlord at a property that resulted in a secure door installed so the building was happy a big deal for people that live there...
SFGTV: San Francisco Government Television
43
43
May 31, 2016
05/16
by
SFGTV
tv
eye 43
favorite 0
quote 0
at the table in front is senior building inspector joe duffy dbi providing the advice for the department of building inspection and joined when i scot
at the table in front is senior building inspector joe duffy dbi providing the advice for the department of building inspection and joined when i scot
SFGTV: San Francisco Government Television
39
39
May 29, 2016
05/16
by
SFGTV
tv
eye 39
favorite 0
quote 0
duffy anything. >> good evening joe duffy dbi the building permit mr. appeals to have been issued properly by dbi a typical remodel on the ground floor rooms at the deck and rear didn't require the firewalls the deck has been pulled in from property line a current approval and we - the building is second story and we did the structural notification and there is an open complaint on the property i on intersections it is filed by the appellant and it was the deck was blocking the view i can't see my room in the window in the yard so we investigated that the complaint is open the inspection on the deck and permit was on unapproved plan many it's updated prior to the suspension of the permit i'm available to answer any questions. >> your notice only goes to the adjacent. >> that's correct. >> doesn't go to the. >> no. >> the appellants property. >> right a structural notification for both sides. >> subject excuse me - to this hearing the nov will it be abated. >> not an nov we issued a - from the permit is upheld we certainly have no reason to keep it au op
duffy anything. >> good evening joe duffy dbi the building permit mr. appeals to have been issued properly by dbi a typical remodel on the ground floor rooms at the deck and rear didn't require the firewalls the deck has been pulled in from property line a current approval and we - the building is second story and we did the structural notification and there is an open complaint on the property i on intersections it is filed by the appellant and it was the deck was blocking the view i...
SFGTV: San Francisco Government Television
37
37
May 21, 2016
05/16
by
SFGTV
tv
eye 37
favorite 0
quote 0
ability to understand what the permit did about with that, i'm available to answer any questions and joe duffy department of building inspection is here if you have any questions. >> thank you. >> inspector duffy. >> supervisors joe duffy dbi basically i'll read the wording on the preempt and tell you that was a formulate over the over-the-counter permit it was issued and suspected and the wording to comply with the notice of violation 20071840 demo of office walls on the first floor i'll prefer if anyone has any questions that's the best way to handle this from the dbi point of view. >> thank you. >> i think i have a question for mr. sanchez to. >> mr. sanchez. >> is it it correct to say there's a change in the keyed since this is all kind of started because of the permit has never not been issued then comes under the purview of the new code. >> that's correct as the code is written and there have been two interim controls and now the permanent controls they're to the applicability and this permit was issued and remains suspected as such those controls apply so the conditional use is required
ability to understand what the permit did about with that, i'm available to answer any questions and joe duffy department of building inspection is here if you have any questions. >> thank you. >> inspector duffy. >> supervisors joe duffy dbi basically i'll read the wording on the preempt and tell you that was a formulate over the over-the-counter permit it was issued and suspected and the wording to comply with the notice of violation 20071840 demo of office walls on the...
SFGTV: San Francisco Government Television
64
64
May 2, 2016
05/16
by
SFGTV
tv
eye 64
favorite 0
quote 0
. >> good evening commissioners joe duffy dbi and ucsf last week he needed to, back to dbi and check we did the proper notification for structural work and we did indeed do the structural add notice that was sent out if i could have the overhead this is a printout of a characterizations from our permit tracking system this is an internal thing i checked generally have this with me doesn't have this last week. >> let's see there it is on the bottom it says structural notification yes, so- it was done and then we have a copy of the letter that was sent to the appellants by dbi overhead again are we done. >> face it in the same direction you'll look at it there we go. >> is that better yeah. this is a typical letter the data of letter on 21st of october 2015 we sent out 11 letters to different buildings around the property where the work was done so i got this in the central permit bureau i'm happy to report that was done and other thing i did a site visit this morning and all of the work seems to be as we normally see in a concrete foundation in sections looks to be done presidential f
. >> good evening commissioners joe duffy dbi and ucsf last week he needed to, back to dbi and check we did the proper notification for structural work and we did indeed do the structural add notice that was sent out if i could have the overhead this is a printout of a characterizations from our permit tracking system this is an internal thing i checked generally have this with me doesn't have this last week. >> let's see there it is on the bottom it says structural notification...
SFGTV: San Francisco Government Television
34
34
May 13, 2016
05/16
by
SFGTV
tv
eye 34
favorite 0
quote 0
we expect senior citizen builder inspector joe duffy dbi and scott sanchez representing the planning department and planning commission and joined by from the public works the public works of mapping please be advised the ringing of and use of cell phones and other electronic devices are prohibited. out in the hallway. permit holders and others have up to 7 minutes to present their case and 3 minutes for rebuttal. have up to 3 minutes - no rebuttal. to assist the board in the accurate preparation of the minutes, members of the public are asked, not required to submit a speaker card or business card to the clerk. speaker cards and pens are available on the left side of the podium. the board welcomes your comments. there are customer satisfaction forms available. if you have a question about the schedule, speak to the staff after the meeting or call the board office tomorrow we are located at 1650 mission street, suite 304. this meeting is broadcast live on sfgovtv cable channel 78. dvds are available to purchase directly from sfgovtv. thank you for your attention. we'll conduct our sw
we expect senior citizen builder inspector joe duffy dbi and scott sanchez representing the planning department and planning commission and joined by from the public works the public works of mapping please be advised the ringing of and use of cell phones and other electronic devices are prohibited. out in the hallway. permit holders and others have up to 7 minutes to present their case and 3 minutes for rebuttal. have up to 3 minutes - no rebuttal. to assist the board in the accurate...
SFGTV: San Francisco Government Television
65
65
May 29, 2016
05/16
by
SFGTV
tv
eye 65
favorite 0
quote 1
ability to understand what the permit did about with that, i'm available to answer any questions and joe duffy department of building inspection is here if you have any questions. >> thank you. >> inspector duffy. >> supervisors joe duffy dbi basically i'll read the wording on the preempt and tell you that was a formulate over the over-the-counter permit it was issued and suspected and the wording to comply with the notice of violation 20071840 demo of office walls on the first floor i'll prefer if anyone has any questions that's the best way to handle this from the dbi point of view. >> thank you. >> i think i have a question for mr. sanchez to. >> mr. sanchez. >> is it it correct to say there's a change in the keyed since this is all kind of started because of the permit has never not been issued then comes under the purview of the new code. >> that's correct as the code is written and there have been two interim controls and now the permanent controls they're to the applicability and this permit was issued and remains suspected as such those controls apply so the conditional use is required
ability to understand what the permit did about with that, i'm available to answer any questions and joe duffy department of building inspection is here if you have any questions. >> thank you. >> inspector duffy. >> supervisors joe duffy dbi basically i'll read the wording on the preempt and tell you that was a formulate over the over-the-counter permit it was issued and suspected and the wording to comply with the notice of violation 20071840 demo of office walls on the...