john fungy.he caltrain -- the calmont program includes the electrification project and the electric procurement that upgrades the safety, and reliability of caltrain service, along the peninsula corridor. the current electrification project will electrify the corridor from san francisco to san jose and replace caltrain's diesel service with high-performance electric trains. reducing air pollution and providing better service to more riders. there we go. sorry about that. >> chair: no worries. >> at your service, john. >> thank you, michelle. so the existing caltrain system, 32 stations from gilroy to san francisco. as chair peskin indicated, the ridership has grown dramatically from 30,000 to over 60,000 riders on a daily basis. the electrified area is south of san jose, north to san francisco, approximately 51 miles. the basic project elements of the infrastructure project are two major upgrades or actual replacements of the substations, one at east grand and the other in san jose. and incorpora