kadashovskaya is being landscaped in the same architectural style as the others embankments in the centerer the work is completed, there will be a single route along the moscow river, from balchug to vorobyovy gory, which is approximately 20 km. a little further along this route, on the taras shevchenko embankment, machinery is also noisy. the upper part of the space was landscaped before, now the lower tier is being updated. this is not the final asphalt, of course, because here the road surface has been very badly destroyed over time, that is, we will level it, then we will roll up the asphalt so that the water flows into the storm drainage grates, so that she was under no circumstances standing on the embankment. the sidewalks will be paved with granite tiles, and the walking paths will be covered with innovative material that is non-slip and allows water to pass through well. you will be able to relax on new benches; more than fifty of them will be installed here, and fresh lawns will be laid out everywhere. where we are now, there will be a rolled lawn, ah, behind the bridge, there i