plants, hydroelectric plants in a month, in two, even in a year, even in two years, for example, kakhovskaya gest, we will not be able to restore it in two years, that is why the energy workers, they draw up schedules, they try to withstand them, but today is the summer period and we need to prepare for the autumn-winter maximum, we need to repair equipment, which even working. in order for us to prepare for the winter, nuclear power units, they also go out for regular repair work, today we receive a lot of equipment from our friends, especially from the baltic states, these are autotransformers of large capacity, the usad government helps, this transformers must be installed, they must be adjusted, and for this the equipment must be turned off, therefore, that is why such powerful work is currently underway, unfortunately, in order to carry it out, additional shutdowns are required, in addition to those related to connected with the deficit, in order to prepare as much as possible for the autumn-winter maximum, even if the level of outages is at today's level, unfortunately, it will not be bette