adapted, therefore, they are waiting for the hospital, it is necessary to reduce the construction period and complete it next year. in the kaliningrad regionadditional multi-purpose vessel, chartered in novorossiysk, entered the line, which will allow faster delivery of goods that fell under lithuanian sanctions to the most western region of russia; now 13 ships will run between the kaliningrad leningrad regions; with transportation, on land, the baltic dry cargo ship will take on board trucks with goods from kaliningrad manufacturers and set off on its first voyage tonight. a new road was opened near rostov today. this is the third stage of the northern bypass of the megapolis , the length of the section is almost 13 km, the builders. two wire tracks were erected here and noise barriers were installed. while working in this area, they were introduced simultaneously with the construction of another large interchange on the ninth kilometer of the federal road that goes from rostov-on-don to taganrog and beyond in mariupol kherson, now heavy trucks that travel through the rostov region to the donbass and crimea will be able to use this route