the instrument in the housing was running in the housing of mehr and keh national action was used. our engineers suggested that we go. we should get permission from the research center so that we can make prefabricated concrete parts, the joints of which are produced in the factory and are transported by trolley. in less than 10 days , in my opinion, the stiffening of the structure will be done . we got the permit for the first time, of course, it took 3 months. we hope that now that i say we hope that it will be delivered to the students by the end of october due to the problems that have arisen in securing credit sources. well, this khatam camp was placed next to us as a specialized and proud device , because if we want these resources that are foreseen in the budget or issues like oil exchange. the two new speed increases, none of these should sacrifice safety, that is, with the safety that we have , all the walls should be earthquake-resistant , so that we do not have any collapse in this structure that was done in baharestan, which we hope for our dear students these days. to