i'm keith run reilly the project manager for mission bay we'll be looking at schematic design and we're excited we have a model feel free to walk around it is heavy but feel free to come over to it can i have a overhead so it's a pretty long presentation i'll go over the boring stuff and my team will be trod we have a lot of them in the audience going through the sxhoefk design we will present the whole project together and other things you asked with this transportation and our person from the office of economic workforce development will be doing that preparation we have reasonable person the warriors a few folks (calling names) we have others that will have takes reintroduce themselves another the appropriate time to answer questions we want to recognize them in the audience so i reminder we're talking about block 29 through 32 located in mission bay south 16th to the south and third street to the west ucsf is across west and the bay front park is 4r0ekd across the east with end in the water line is owned by salesforce.com and warriors have agreed to purchase that land. >> those dire