in a well-executed manner on all kinds of materials, which from this we used the area of khoros azad universityr efforts were not in a few days to reduce the areas affected by this crisis to a minimum. fourth, in tehran , we have a solution for the difference in the distance above 800 meters , considering the age of the facilities and actually in the water supply system. we agreed to do as much as possible with the water cooler capacity of this facility let's transfer tehran, you know, while the facility is very strong , it is very old, reza would increase this risk-taking for us . we were listening to the karaj dam to clean this process, how will it proceed, they lowered it, we transferred it, and when the pressure was removed from the power plant, we were able to send lighter pumps to tehran from the existing facilities, including the series of 220 liter barrels. which was in the place that we built a whole to be able to pump let's put water on it and finally bring it near the deposit. we will compare the pump from this place to the moon. we will go to as many pumps as we can. in fact, it is