and within slip way four, we are talking about using ship building kiel blocks for ship furnishing and could be used for the ramps down into the slip way and this is the park entrance through the building, 109 and where we are talking about having a park, pa vif on and a shelter and park and a boat storage and the space for ship building artifacts. and then, this is what it would look like at the end of the slip way four, and looking back towards the mari time fields in building, 109, and then, lastly, in an ariel perspective of how we are talking about reintroducing slip ways, 1, 2, 3, and allowing the bay to come up into the site and have enter tidal plant and so it is a soefter shore line edge. >> for the park the total projected budget for the project right now is about 45 million dollars in total. that is about 5 million dollars in acre, which is on scale, with the amount of money, the cost associated with improvements and the other parks city wide. and the doloris park, for example is 7 million dollars an acre to rehab tait it and the mission bay are running 3 million an acre in