, for example, koloma, for example, the same kureiskaya hydroelectric power station, for example, theaya hydroelectric power station 1 2 3, talking about the good, for now about it, we continue with the manufacturers, and what is there that russia cannot do, probably? in hydro-thematics we can provide 99% of hydropower with our own equipment, here on the power machines we saw what a new parcel was packed and for the already familiar to us uglichskaya hydroelectric power station. let's go back right now to the upper volga. that our old friend is exactly it already with us is being installed. how much did you produce and how much will you produce thanks to the modernization? the installed capacity of the old unit was 55 mw, the new unit will be 65 mw, that is, it is significant. and engineer shubnikov at one time meant primarily ligature under white coal. the reserves of white coal are inexhaustible. for understanding, the interiors of uglichskaya gaz are so reminiscent of the first stations of the moscow metro, because both were built in the same era, when, by the way, domestic enginee