length of 502 m is building a flyover 504 m long on sections from kaspiyskaya street to the first kotlyakovsky laneilders are working on the installation of metal structures on temporary supports and access devices to the overpass in front and the pouring of concrete, the installation of protective structures, this section of the crocodile is already 70% ready, only 9 km long. but this is one of the most difficult stages of the project, we had to shift dozens of large highways, heat. supply sewerage water supply of storm sewers, which have already developed here over the years. uh, the existence of this part of the city, we now have to build an overpass on koshkin street, rebuild a huge sewer collector, 12 m deep, 6 m wide . the new highway of moscow, a 40 km long route, this junction of the rublevsky highway with the moscow ring road will pass verkhnie poles street in kapotnya, 32 km of the road has already been put into operation, a it will connect major highways, eastern and western moscow ring road kutuzovsky michurinsky leninsky proletarsky proletarsky kashirskoye warsaw besedinskoye highway,