the gas of the kovykta and chinginsky fields is rich in valuable components , propane, butane, pentangensannd helium, in order to produce products from them in russia. gazprom is building the amur gas processing plant, which is connected to siberia. there is simply no production in our country, the capacity of 42 billion cubic meters of gas per year today, the degree of readiness of the amur gpp is almost 90% the most important element. in fact , this complex makes it possible to obtain significant products, uh, which are very necessary for gazprom for foreign markets for chemical gas. i believe that the project of our country has not yet been implemented with such a capacity. this most powerful project for our country will be the third gas export route to china called the far east. the corresponding agreement was signed with the chinese side at the beginning february, 202. a gas pipeline branch from the existing gas transmission system will be built in the dalnerechensk region, in 2011 the sakhalin main dam of khabarovsky vladivostok e-e was built, and together with the head compressor at