the latest technologies were used in the modernization of the hydropower complex of the krasnopolyanskayahpp, which since 2010 has been part of the structure of lukoil, an investment of about 40 million rubles. focused on modernizing and the head unit of the krasnopolianskaya hpp for 70 years. it was physically worn out and required repair, the replacement of part of the equipment of the work carried out made it possible to significantly increase the reliability of the station through the use of new materials. a fully automated process control system was made here, which ensures the operation of the station remotely. at the first stage, there was also a modernization of the concrete surfaces of the spillway faces, replaced with partially deformed concrete. so, in the second stage it was the hydro-mechanical equipment was replaced, which makes it possible to control gates, galleries and spillway shields and the third stage. this is a tray upgrade. uh water intake galleries. the watercourse makes it possible to generate 16 mw of electricity, which goes to krasnaya polyana and greater sochi