that process is, where the soil is, and what happened with it, so i would add those two items are kriewcialg for us to understand, and i would agree that the 311 notification in addition to that is satisfactory conclusion. thank you very kindly. >> i agree on one of them which is the soils testing. given that the district there has had a lot of issues with their soil. >> we will test the soil and provide the results to the building department or whoever else you want it provided to, health department, whatever. >> since you this has been opened up and in the letter of january 3 and no soil has been removed and container of sand and could you clarify that. >> i will let him clarify that because it's with the construction of the -- reare retaining of the loading dock. >> i'm sorry. what was the question? >> according letter a container of sand was received and no soil was removed from the site. >> grade was set a long ago and what is in the soil 10 feet down is an issue granted. when they built this structure and back filled that soil with clean sand. i was out at the building after you tracki