high speed diameter exit is an entire 2.5 km long route that will connect the whsd with the latitudinal highwayhe southern regions of st. petersburg. part of the route... is already being dressed in asphalt, somewhere else the skeleton of the highway is being formed, the frame of the entrance to the western high-speed diameter took a long time to assemble due to the railway, the overpass was built over the tracks without the help of a crane. the sliding method is when the metal console, which is located below us, was moved forward with the help of a jack, the same, roughly speaking , elevator, only horizontally. thus, there was no need to block the movement; the sliding was carried out while moving. trains, traffic on moskovsky had to be stopped for a month, but as delicately as possible, only at night. the overpass over the avenue is the most difficult section of the entire interchange; the route had to fit into a narrow space among dense buildings, and besides, the highway here is two-tiered, sandwiched between the railway and factory building. we are in the lower direction, yes, it is toward