planning to lauaunch 30 new electric vehicles across a wide range of price points ns the next five yearsold company? >> i do. it's the biggest thing that the industry has seen in a long, long time. >> gm is rebuilding this massive 4.5 million square foot plant in misch. now called factory zero. as in zero emissions. the name of the street out front, also got juiced. so the robots look ready to go. ours were the first network tv cameras let inside to see what plant manager jim quick says is the factory of the future. this body shop when complete will be the biggest body shop. >> the biggest one you got? ♪ ♪ >> factory z zero willl producee version of the onhummer. and they will launch this, a version on of the bolt, called the euv. you want an all ev fleet by 2035. when you looked at the statement and said is, your goal is to eliminate tailpipe emissions, there's wiggle room in there. >> there's a bit of wiggle room in there. and the goal to do that will be based on the consumer and how well we solve the problems that people perceive around the electric vehicles. >> i think most americans