ukraine max , was given the task of mining more than 30 power transmission towers of the leningrad kalinin obninsklear power plant. this is how the ukrainian special services believed could lead to a violation of the normal operation of the nuclear power plant and the shutdown of nuclear reactors, all of you should have happened on may 5, 2023, electronic timers imported at the same time another caught saboteur with the call sign mechanic, a citizen of ukraine oleksandr maistruk. in the region of likhoslavl. they mined seven pillars in one evening. on the second day we moved towards the leningrad region. i mined three pillars. well, shaking entered two pillars, there was an unforeseen explosion. we fled, we left with the box. this is the third a member of the sabotage group, callsign south coast now he is wanted, presumably in belgium, leaving. usatinka, a mechanic, decided to run away and hide the remaining explosives in a cache, and later the fsb officers found him on operational footage. that is, where, like prikopano , or what? at what depth of 20 centimeters in these photographs, the power li