the third priority area, the connection between lewis sutter and man sel courts.this shows the current asphalt path from the lewis sutter playground toward the rest of the park. we went out and did a site visit and the slope on that path is 19%. ada slope required allowed is much, much less than that. we're looking at realigning that path and looking into the possibility of making it firm and stable, but again a little more natural feel than asphalt. and we're also looking to reconfigure the asphalt path and steps closer to the man sel courts and we're looking to accommodate bicycles on a multiuse trail that meets ada guidelines, but we've worked with the guidelines in glen canyon park and golden gate park and there is lot to do to make it interesting and exciting. for some of the trails we're looking to realign or close in the area, would we use some of the natural features funding to scrape up the soil, to put seeds in, to put erosion control to go back to grassland habitat. last but not least, the visitation avenue corridor. this is the area that runs from visi