in the interim, i've talked to lisa wong, who is a member of the affected neighbors. she is on the north side of this tract. she is the lower neighbor on the north side. she is an architect, and we had a conversation today. she indicated, and she indicates on page nine of her letter, if you have had a chance to read that, that she was willing to compromise. even after the hearing, she was willing to -- do you have the big picture? she was willing to -- according to her letter, she was willing to actually consent to driving them to the red line that was marked by a contractor. >> can you point to the red line? >> i am sorry we don't have a smaller picture. >> that is the red line there? >> yes. >> she on page nine said she agreed to do that even after the hearing so it would not cause all this disruptive destruction to this roof. that is what we would like to do. we would like to help the neighbors. we would like to drop it. we would like to get it done, restore some community to our little community and get rid of some of the anger that is going on here. there is a lo