the recreation park departments includes the locationses. the proposed project consist of five elements including construction of a perennial pond located approximately 500 feet. relining a path for golf course hole no. 14. the removal of vegetation within stable pond and the connecting tunnel that links horse stable pond. and the walkway, 16 feet wide and replacement of existing wall and concrete wall. described, the california and to facilitate continued operations of pumps and maintenance of infrastructures. the project is being proposed consistent with bylaws. the bylaws were issued by the -- for horse stable pond for the maintenance walkway and replacement of existing wood retaining wall on the existing pump house. you have before you in the packet the draft motion are response to the appeal letter and comment letter and the amended pm and d. the department established the pm and d. during the appeal, the department received a letter and on behalf of the wild life institute on october 8, 2013. ascribed in the appeal response both raise