we will go down there once a month just to check on it and to check the special inspections logbook, but traditionally all of the earth moving work and she through special inspection. we will get down there. >> 94 expanding that. is there a timing relationship -- >> thank-you for expanding that. is there a time relationship -- timing relationship for inspectors and the time that we need them and when they can be put in place? >> we have one more that we can call back at uthe puc. additional inspectors after that, we would have to initiate a test. >> in terms of the clerks, the city is waiting for testing to occur for p-clerks and the level below that. they finished doing that. but have the application period that ended at the end of last week. we are going to the process to see how the ratings came up. and then we will be doing the actual hiring. we continue to run into this situation where the city has to do testing for large groups of physicians. some of which we can do ourselves. some of which we cannot. >> do we have the ability to encourage them to expedite those tests in a mann