removal of the third part of the urmia treatment plant, with the presence of the deputy with manullahullah muhammad and the family of muhammad , more than 2 thousand billion rials have been spent to build this part of tasbih khan and its 11-kilometer transmission line, technology with the help of management this crowd comes to do something today which was the place of pollution, the environment was being destroyed, this lake is drying up from today, also in this place, mr. mokhbar ordered the construction of the fourth and final part of the urmia treatment plant . with the transfer of water from the urmia treatment plant and the first phase of the water transfer system of the kansi dam, which was put into operation in march last year in the presence of the president , the water transfer to lake urmia has reached 351 million cubic meters per year. badin abad channel will be completed by the end of this year when the operation is reached and the development plans for transferring water to lake urmia are almost finished, about 1700 billion tomans are needed in this sector. also, in this trip , the com