4
4.0
Dec 10, 2022
12/22
by
RUSSIA24
tv
eye 4
favorite 0
quote 0
marat khusnulin discussed the preparations at a meeting on behalf of the president, the forum was given federal status. conditions of new economic realities this event is of strategic importance for our country, it will strengthen the business ties of russian business with the countries of the islamic world. we have great prospects for cooperation with muslim countries. moreover, russia's goods turnover with them over the past 3 years has increased by 25% and reached $ 112 billion. russia sees the islamic world strangely as its own. reliable strategic partners is that most of them are supported by their own and independent policy in the international arena. now it allows developing joint projects and using new opportunities in the context of russian sanctions and the need to ensure the economic interests of the country , the possibility of expanding interaction between the russian federation and muslim countries is significantly increasing. kazan is an effective economic tool for this work, and is also part of the activities of the strategic vision group the russian islamic world, which
marat khusnulin discussed the preparations at a meeting on behalf of the president, the forum was given federal status. conditions of new economic realities this event is of strategic importance for our country, it will strengthen the business ties of russian business with the countries of the islamic world. we have great prospects for cooperation with muslim countries. moreover, russia's goods turnover with them over the past 3 years has increased by 25% and reached $ 112 billion. russia sees...
11
11
Dec 5, 2022
12/22
by
RUSSIA24
tv
eye 11
favorite 0
quote 0
deputy prime minister marat khusnulin.fered to reward the builders thanks to who managed to complete a large amount of work ahead of schedule. vladimir putin supported this idea. there are practically no violations on the left side of the railway track. yes fully working going. uh, trains and passenger freight are always going straight ahead, no violations. no security is provided. without safety precautions observe crawling. there, right here at such a height, and they are with these belts. well, yes specially trained people selected means for this organization, in general, they considered five options, which means the organization of work and settled on technology. that is, the superstructure will be lowered from bars and a new superstructure will rise into place. that's it, yes he was held directly with the designer and here for a week, probably.
deputy prime minister marat khusnulin.fered to reward the builders thanks to who managed to complete a large amount of work ahead of schedule. vladimir putin supported this idea. there are practically no violations on the left side of the railway track. yes fully working going. uh, trains and passenger freight are always going straight ahead, no violations. no security is provided. without safety precautions observe crawling. there, right here at such a height, and they are with these belts....
10
10.0
tv
eye 10
favorite 0
quote 0
during the sabotage of the ukrainian special services, this was announced by deputy prime minister marat khusnulinto him, about half of the spans have already been delivered to the site . some of them were assembled at the same time , the damaged structures were dismantled, the installation specified that the main restoration work is planned to be completed in march next year. this monday, let me remind you, we resumed traffic on the repaired right side of the bridge, the result was checked by vladimir putin. he personally drove through the crossing, they met completely replaced four spans in less than 2 months. our soldiers of the special operation are undergoing treatment and rehabilitation, what do they need and what additional assistance can be provided to them and their families. all these issues can be provided directly with the military. treatment-and-prophylactic departments in each comfortable ward with modern equipment. vorobyov talked to doctors and patients, thanked the servicemen for their work and wished them a speedy recovery on all requests. promised. find a solution. what worries
during the sabotage of the ukrainian special services, this was announced by deputy prime minister marat khusnulinto him, about half of the spans have already been delivered to the site . some of them were assembled at the same time , the damaged structures were dismantled, the installation specified that the main restoration work is planned to be completed in march next year. this monday, let me remind you, we resumed traffic on the repaired right side of the bridge, the result was checked by...
20
20
Dec 6, 2022
12/22
by
RUSSIA24
tv
eye 20
favorite 0
quote 0
this was promised by marat khusnulin more about the work already done on the deputy prime minister spokehe unique technology for the restoration of spans in an interview with our tv channel. we have applied a unique bridge repair construction technology in 10. who knows bridge building, usually the bridge is always moving forward, metal beams. so they are made on trolleys, each trolley is 300 tons. to do this, traffic is blocked and moving forward, the bridge is slowly moving forward in multiples , and forward in this case, we approached differently. we brought the bridge to the operating bridge on the trolley and moved to the right they shifted to the right, that is, not forward, but shifted to the right, but these metal structures, and then weld them. can you imagine what accuracy should be in order to move 300 tons of construction with jacks, there is accuracy to the millimeter. the embassy of uzbekistan today presented an award to zemfira trigulova. so they noted the great contribution of the director of the tretyakov gallery to the restoration of cultural ties between moscow and tas
this was promised by marat khusnulin more about the work already done on the deputy prime minister spokehe unique technology for the restoration of spans in an interview with our tv channel. we have applied a unique bridge repair construction technology in 10. who knows bridge building, usually the bridge is always moving forward, metal beams. so they are made on trolleys, each trolley is 300 tons. to do this, traffic is blocked and moving forward, the bridge is slowly moving forward in...
5
5.0
Dec 5, 2022
12/22
by
RUSSIA24
tv
eye 5
favorite 0
quote 0
marat khusnulin told the president. how did the renovation work go? this made it possible to organize the entire reinforced assembly of all metal constructors right here, which is why there are three plants of the largest metal producers in siberia, including here, tyumen, fortunately 160.000, yes, smelly 1.000.214.100, uh, thanks to the fact that we have such a very extensive construction program across the country now and was there is metal in the presence of pavements, products, so we quickly transferred this metal to the production of such structures directly and in 2 weeks we collected all 1,230 tons and brought them here. any fully escorted machine was considered a governor. and we got just such a summary. how much is made? how much kiev was delivered, and here at the production base of the federal road traffic agency, the builders gathered and they already brought the constructs and assembled them before the court. how many people work 500 people worked in complex mode, so, uh, three lapkans four barges and orders, 21 equipment is a normal mach
marat khusnulin told the president. how did the renovation work go? this made it possible to organize the entire reinforced assembly of all metal constructors right here, which is why there are three plants of the largest metal producers in siberia, including here, tyumen, fortunately 160.000, yes, smelly 1.000.214.100, uh, thanks to the fact that we have such a very extensive construction program across the country now and was there is metal in the presence of pavements, products, so we...
5
5.0
Dec 21, 2022
12/22
by
RUSSIA24
tv
eye 5
favorite 0
quote 0
five million square meters in new territories, said deputy prime minister marat khusnulin, he drew attentionto the fact that the road industry, despite the covid sanctions pressure of restrictions on construction resources, continues to develop systematically, for example, the targets for the repair of regional roads, which were planned to be achieved in the twenty-fourth year, systemic work has almost been completed in 3 years. raised the standard condition of roads in the agglomeration by 14% of regional roads by five and two percent and the national goal, which we had to achieve in the twenty- fourth year, at least 50% of roads, e regional normative states have already been practically reached this year by e, 2 years ahead of schedule. we are missing 0.3% next year. we will definitely move on. this is an indicator of the national average assured that next year the indicator for the repair of regional roads will reach good routes. people will receive almost 2 years ahead of schedule. all of a sudden these technologies have become which invent the future of the speed of the changes that hav
five million square meters in new territories, said deputy prime minister marat khusnulin, he drew attentionto the fact that the road industry, despite the covid sanctions pressure of restrictions on construction resources, continues to develop systematically, for example, the targets for the repair of regional roads, which were planned to be achieved in the twenty-fourth year, systemic work has almost been completed in 3 years. raised the standard condition of roads in the agglomeration by 14%...
5
5.0
Dec 21, 2022
12/22
by
RUSSIA24
tv
eye 5
favorite 0
quote 0
this is approximately 60,000 km. five million square meters deputy prime minister marat khusnulin saidin the new territories, he drew attention to the fact that the road industry, despite the sensational pressure of restrictions on construction resources, continues to develop systematically, for example, targets for the repair of regional roads, which were planned to be achieved in the twenty-fourth year already almost. systematic work over 3 years has increased the standard state of roads in agglomerations by 14% and in regional roads by five and 2%. and the national goal that we had to achieve in the 24th year is at least 50% roads, e regional normative states have already been practically reached this year by e, 2 years ahead of schedule. we are missing 0.3%. next year. we will definitely move on. this is the national average for consumption stolin assured that next year the indicator for the repair of regional roads will reach good routes. people will receive almost 2 years ahead of schedule. the moratorium on scheduled business inspections has been extended for the next year for u
this is approximately 60,000 km. five million square meters deputy prime minister marat khusnulin saidin the new territories, he drew attention to the fact that the road industry, despite the sensational pressure of restrictions on construction resources, continues to develop systematically, for example, targets for the repair of regional roads, which were planned to be achieved in the twenty-fourth year already almost. systematic work over 3 years has increased the standard state of roads in...
4
4.0
Dec 6, 2022
12/22
by
RUSSIA24
tv
eye 4
favorite 0
quote 0
marat khusnulin. on the way, they talked, among other things, about the development of a land route to the peninsula. of course, we also need to provide reliable communication. please, i know that work has been carried out there, how much more than 300 kilometers of the route of one border was the entrance to the rostov region of them. uh can you we also reported in the summer that we had begun repair work there, of which 180 km. we have brought it into a normative state. that is, the roads there were of poor quality, which means that we completely brought them into line between on your instructions , the organizer there, a safe following car guards us so much with you, security is ensured. when we are in columns, there are strong storms and the crossings do not have time to transport the number of trucks. representatives of contracting organizations reported to the president, they were responsible for repairs. here is the part canvas collapsed. we will lay the lower layers of the valtoconcrete on the
marat khusnulin. on the way, they talked, among other things, about the development of a land route to the peninsula. of course, we also need to provide reliable communication. please, i know that work has been carried out there, how much more than 300 kilometers of the route of one border was the entrance to the rostov region of them. uh can you we also reported in the summer that we had begun repair work there, of which 180 km. we have brought it into a normative state. that is, the roads...
9
9.0
Dec 28, 2022
12/22
by
RUSSIA24
tv
eye 9
favorite 0
quote 0
the domestic construction industry about this interview to our tv channel deputy prime minister marat khusnulin, as in the pandemic, construction volumes did not decrease. and this applies to both the housing sector and road infrastructure. moreover, the ministry of construction plays the most active role in restoring peaceful life in the new territories. in general, the country is expected to record high housing construction. this year it will be historical we will definitely cross the bar of 100 million square meters by the end of january, it will be clear how much i would build exactly, but this is definitely more than 100 million. uh, we can see from preliminary data statistics. what is 100 million square meters. this is 3 million, 600 families have improved in their lives. we are all targets. watch the full interview with deputy prime minister marat khusnullin on our air today after 10 am moscow time. and at the end of the issue, i remember the exchange rate for today, the dollar is 69 rubles. 93 kop. euro 74 18 about the economy, while everything was given by sports news and will be prese
the domestic construction industry about this interview to our tv channel deputy prime minister marat khusnulin, as in the pandemic, construction volumes did not decrease. and this applies to both the housing sector and road infrastructure. moreover, the ministry of construction plays the most active role in restoring peaceful life in the new territories. in general, the country is expected to record high housing construction. this year it will be historical we will definitely cross the bar of...
9
9.0
Dec 28, 2022
12/22
by
RUSSIA24
tv
eye 9
favorite 0
quote 0
was the best for it in history , said in an interview with our channel, deputy prime minister, marat khusnulingrowth was about 5-6% due to the overfulfillment of most of the planned indicators, 7 million people are currently employed in the industry. it provides 14% of all tax revenues to the country's budget. by the end of the year, more than 100 million m² of housing will be commissioned. thanks to this pace of construction, 3 million 600,000 russian families have already improved their living conditions. serious support. provides preferential mortgages. the decision to extend it until the summer. 2024 a positive signal for the industry believes marat fell asleep good indicators and for the construction of roads 170 million m² of asphalt were laid. and this means that the dynamics of trucking across the country will grow and further one of the key development projects next year will be the eastern training ground. of course, next year you will have a construction project this year. this year we had a key construction site, this is the construction of the m12 road. uh, moscow kazan-yekaterinb
was the best for it in history , said in an interview with our channel, deputy prime minister, marat khusnulingrowth was about 5-6% due to the overfulfillment of most of the planned indicators, 7 million people are currently employed in the industry. it provides 14% of all tax revenues to the country's budget. by the end of the year, more than 100 million m² of housing will be commissioned. thanks to this pace of construction, 3 million 600,000 russian families have already improved their...
13
13
Dec 16, 2022
12/22
by
RUSSIA24
tv
eye 13
favorite 0
quote 0
marat khusnulin now road construction plans are overfulfilled only this year three large facilities wereion of the m12 moscow-kazan highway, a ring road around yekaterinburg, the archangel bridge in cherepovets plans for the coming years for the construction of road repairs in the country are no less ambitious. you have set the task that over the next 5 years, at least half of all regional roads in the country should be in standard condition, at least 85% of the roads in the largest agglomerations, where the majority of the population lives, should be in standard condition, and that all of this the backbone road network, the so-called 138,000 km of roads, on which about 80% of goods and passengers travel, was 85% in the standard state. here, in order to line up this system, we made a five-year program earlier. we built on dependencies. we had many different programs. they were not all interconnected, they were not all synchronized. now the task is to put the roads in the country in order. jeweler's precision at the site of the kursk npp completed the installation of the dome of the conta
marat khusnulin now road construction plans are overfulfilled only this year three large facilities wereion of the m12 moscow-kazan highway, a ring road around yekaterinburg, the archangel bridge in cherepovets plans for the coming years for the construction of road repairs in the country are no less ambitious. you have set the task that over the next 5 years, at least half of all regional roads in the country should be in standard condition, at least 85% of the roads in the largest...
14
14
Dec 28, 2022
12/22
by
RUSSIA24
tv
eye 14
favorite 0
quote 0
difficulties, was the most successful for the domestic construction industry, deputy prime minister marat khusnulinhis interview to our tv channel, as in the pandemic, construction volumes did not decrease. and this applies to both the housing sector and road infrastructure. not only does the ministry of construction play the most active role in restoring peaceful life in new territories, but records are also expected across the country as a whole. here is the structure of housing. in that the year will be historical. we will definitely cross the bar of 100 million square meters by the end of january . what is 100 million square meters. this is 3 million, 600 families have improved in their lives. we have exceeded all targets. watch the full interview by deputy prime minister marat khuskulin on our air today after 10:00 am moscow time and at the end of the issue i will remind exchange rate for today dollar 69 rub. 93 kop. euro 74 18. and while that’s all for me roman , we continue to study the latest message to the chinese sea ended with joint russian, chinese military exercises maritime interactio
difficulties, was the most successful for the domestic construction industry, deputy prime minister marat khusnulinhis interview to our tv channel, as in the pandemic, construction volumes did not decrease. and this applies to both the housing sector and road infrastructure. not only does the ministry of construction play the most active role in restoring peaceful life in new territories, but records are also expected across the country as a whole. here is the structure of housing. in that the...
6
6.0
Dec 16, 2022
12/22
by
RUSSIA24
tv
eye 6
favorite 0
quote 0
according to the singer, prime minister marat khusnulin, plans for road construction are overfulfilledntry. only this year, three large objects were opened. this is a section of the m12 highway, moscow kazan ring highway around yekaterinburg and also the arkhangelsk bridge of cherepovtsy, the list of tasks for the coming years is not less. and we set the task that over the next 5 years, at least half of all regional roads in the country should be in standard condition, at least 85% of the roads of the largest agglomerations, where the majority of the population lives, should be in standard condition, and that this whole road network is the so-called 138.000 km of roads, on which about 80% of cargoes and passengers move, was 85% in normal condition. here, in order to build this system, we made a five-year program earlier. we built on dependencies. we have there were many different programs. they were not all linked to each other, they were not all synchronized. now the task. here is to bring the country's roads in order. and these are shots from sakhalin, the northeast of the island is
according to the singer, prime minister marat khusnulin, plans for road construction are overfulfilledntry. only this year, three large objects were opened. this is a section of the m12 highway, moscow kazan ring highway around yekaterinburg and also the arkhangelsk bridge of cherepovtsy, the list of tasks for the coming years is not less. and we set the task that over the next 5 years, at least half of all regional roads in the country should be in standard condition, at least 85% of the roads...
15
15
tv
eye 15
favorite 0
quote 0
work, reconstruction of the left automobile part, this was announced by deputy prime minister marat khusnulin according to him. now the delivery and assembly of superstructures is organized, at the same time, the structure is being dismantled, damaged as a result of the terrorist attack on october 8, organized by ukrainian nationalists . last monday, traffic was resumed along the right automobile part. the railway communication is also completely restored, well, it plans to finally complete the work in march next year. now about how they render medical assistance to soldiers who took part in a special military operation in a multidisciplinary military hospital near solnechnogorsk, those who were wounded are being treated defending the donbass in the hospital, 28 full-time medical and diagnostic departments and offices of various profiles are deployed more than 300 experienced specialists work to meet with doctors and visit them patients arrived governor of the moscow region, what worries you or your families in their units? maybe there were some topics that were touched upon you can also talk
work, reconstruction of the left automobile part, this was announced by deputy prime minister marat khusnulin according to him. now the delivery and assembly of superstructures is organized, at the same time, the structure is being dismantled, damaged as a result of the terrorist attack on october 8, organized by ukrainian nationalists . last monday, traffic was resumed along the right automobile part. the railway communication is also completely restored, well, it plans to finally complete the...
3
3.0
Dec 6, 2022
12/22
by
RUSSIA24
tv
eye 3
favorite 0
quote 0
deputy prime minister marat khusnulin named today, who spoke in more detail about the work already donetechnologies for the restoration of spans in an interview with our channel. we have applied a unique technology for the construction of bridge repairs, here, if anyone knows, bridge building, usually the bridge is always moving forward, metal beams. so they are made on trolleys, each trolley is 300 tons. for this , traffic is blocked and moving forward, the bridge is slowly moving forward there , but forward in this case, we approached differently, we brought the bridge on carts on the existing one along the existing bridge and shifted to the right, shifted to the right, that is, not forward, but shifted to the right these metal structures, and then they were welded. can you imagine what accuracy should be in order to move structures there in multiples of 300 tons, there accuracy is up to millimeter. there, in order to implement the tasks of supplying the russian armed forces, the vice-m. sorry prime minister. mikhail mishustin meeting of the coordinating council for providing the army
deputy prime minister marat khusnulin named today, who spoke in more detail about the work already donetechnologies for the restoration of spans in an interview with our channel. we have applied a unique technology for the construction of bridge repairs, here, if anyone knows, bridge building, usually the bridge is always moving forward, metal beams. so they are made on trolleys, each trolley is 300 tons. for this , traffic is blocked and moving forward, the bridge is slowly moving forward...