after the terrorist act was committed on the crimean bridge and the day before, marat khusnuren at a meeting with the president announced the terms for the restoration of the crimean bridge before the autumn , a reverse traffic will be organized here to launch two-way traffic. builders are planned to build on the crimean bridge by the fifteenth of september. well, to completely restore the bridge by november 1 of this year, specialists have already begun to manufacture new span structures; this is being done by specialists in voronezh here in the crimea and the best bridge builders have already been sent to the kerch strait in tamaniv, who will be engaged in the restoration of the crimean bridge, if if we talk about the organization of traffic for various types of transport today between the two coasts of the crimea and the krasnodar territory, then it can be driven in a car in two ways, both along the crimean bridge, where reverse traffic is organized, and using a ferry ferry. after a short night stop , they resumed their work and now run between the two banks and transport cars. we