>> i'm mark zucker. i'm the adjacent neighbor at 444 greenwich. i'm also a design professional and design custom homes all over. i have a lot of expertise in this matter. a little history on this property and my property. i purchased my home roughly 3 1/2 years ago. it was in dire need, everything needed to be replaced. the first thing that we did was to reach out to the neighbors and the telegraph hill dwellers and understand the neighborhood and the intent of the neighborhood and how -- how things work. and what people's expectations were. based on that, i worked backwards. as the -- as a result, i maintained the integrity of the home. 1908. we kept the entire building envelope intact. we didn't go up or out. we worked within our envelope to preserve the height to our neighbors, including the neighbor next to us who is proposing push out. 18 months ago we completed the renovation. the photos i prepared illustrate that. my problem here is a proposal -- i looked at item 10, there was an impact. this is a significant impact, much more than that. we