it is the protest of issuance on may 18, 2010 to mary galvin a permit to alter a building, comply with various nov's, convert a crawlspace to storage, cap existing foundation, roof framing, add three dormers, stairs from basement to attic, replace windows and trim in kind, and remodel kitchen and bathrooms. president peterson: thank you. ok, ms. wuerfel, you have three minutes. >> i am nancy wuerfel protesting the approval of a building alteration permit to the house next door. this appeals about mistakes made by all the parties that contributed to issue a permit in error. it is also about the unresolved the legal structures on the subject property. at first, the owner has submitted plans containing numerous errors and omissions in the existing dimensions, materials, and layout which do not reflect the present conditions. the proposed scope of work and plan drawings do not fully describe what is to happen in this project, nor are there sufficient engineering drawings to accomplish the work intended for the retaining walls and upgrades. there are inconsistencies between the plan sheets,