their team for the metro station slavyansky boulevard blacksmiths, forged trees and ornaments for maryina groveng of musical panels, work in the metro is carried out at night, it was necessary to have time to do installation work with an interval of an hour or four. it's very exciting, because you had to run down. way down. excavator not working. all this on yourself you can do everything and equipment tool. today you won’t have to carry anything, but eva will carry out the designer’s supervision with full immersion in the profession. so the first i am not a stencil drawing, which she herself developed. i just trace it right and draw the lines. uh-huh around the edges. wait , what is metal? we used sheet metal here, steel three transferred the drawing and now we can proceed to the cutter. i will trust. this is serious for you. yes, then you will lead the line. make sure the line stays on the right side. get out of here. by the way, the seam turned out to be even, but i think that it is worth entrusting the work of professionals to complete the cool thing, that i myself take part in the creation