large-scale reconstruction at the railway station, such as maskovskaya and chkalava streets.ines and circular saws operate in 24:7 mode. ramont for an hour, kolkasts. the collapse in both directions was marked by two, and suddenly the number of molasses of cars increased. yes, these hours of comfort for motorists must be taken with caution. the bridge, well, it was clear that it needed repairs, there were these repairs, patches, of course, this it definitely causes inconvenience, because in the morning and evening during rush hours it causes a large accumulation of cars, well, you can get used to it, the most important thing is to allow some time to travel through these sections. and i think that it’s worth being a little patient, soon everything will be restored, traffic, and most importantly, the bridge will become safe. eliminate radical defects. all spans of the bridge are changing to new ones, materialized belek and re-opening from the current mixtures of more stable and loads and useful minds. restoration work has been completed supports of four spans, the eighth and ni