residence documents. the reason for the delay in the implementation of mehr housing during these years is tolerable.block 15, 15th floor, 4 people did not give the right to the samovar weapon. and the facility was used up, a part of it was bought and sold, the party in need was sold, the unit was sold, the agency bought it, it didn't pay attention, and that investment is not coming. it should be understood that the differences between the employer and the contractors, the increase in the price and cost , the problems of the cooperatives, and legal and judicial problems are among other reasons. the delay in the construction of mehr housing for the most basic work here, which is obtaining a permit and has not been completed for 10 years, the existence of infrastructure facilities in the area, the provision of water supply sources , the sewage collection network, these costs are the responsibility of the trustee and the cost is very high . however, among the unsolved infrastructure problems of the campus, they say that the roads are beautiful, there is a problem with the asphalt, the water streams are