bribe from representatives of the contracting organization on an especially large scale; a 2020 mercedes kelntvagenrubles was given as a bribe. what kind of services did contractors, representatives of a large organization buy for an official? at first, local journalists were almost sure that the builders simply didn’t finish something or skimped on materials, and then they asked the inspector to close his eyes to this and sign the certificate of completed work, but in reality everything turned out to be much more complicated, so that our film crew from krasnoyarsk will figure out the situation. our information. the village named after lukashevich was formed during the construction of the abakan taishet railway line. named in honor of the commander of the demolition group, boris lukashevich, who died in 1964 during the ice drift. the road through the taiga was long, but very long. when we got to the right place, it turned out that the settlement as such no longer exists, its last inhabitants left several years ago, as there was no work, here is the railway platform of the same name exists, from it