the mhra will not work if we don't adequately characterize the earthquake hazard. forecasting the earthquake behavior of this waterfront is a complex task, to ensure we stay on track, the independent seismic peer review panel has been engaged loongs the way. they will also not engaged as we start to develop solutions. it's important to note that while we're focused on life safety and disaster response in this phase, the solutions will need to provide flood protection, align with the adapt strategy and perhaps lineup with envisioning the future. now i'd like to talk about the general investigation. the port has been seeking assistance from the corps since 2012, and we are excited to begin working with the corps on the cap 103 authority along a smaller section of the seawall, but we are thrilled to now be working on them on the general investigation of the entire port. there's no limit to the scale, extent, or cost of g.i. projects, which are typically cost shared, 65% federal and 35% local. now it's usually not that simple, but it will be for today unless you ask me