my name is michael cassidy. i am the contractor. this area here is the area that was requested to be dropped by 1 foot in the original agreement. this is the wall that they say is totally demolished, where she says a 26 foot area, whatever -- or she says a 26 foot area. it is not demolished, as shown in their own photographs. -- photograph. they did not cover it at all, they just left it like that, so when we stripped the sheet rock from the inside, it exposes bare citing -- it exposes their siding. it also exposed at the floor, which is approximately here, their siding missing all of the way across. commissioner fung: mr. cassidy, let me ask my question. when you opened up the building, did you find that a member sizes changed from your original exploration would have indicated? >> every set instead is the original size -- every second stud is the original size. you can see it all of the way along. there is a new study here, but they are all new, too -- there is a new studys -- tud -- stud here. >> every second one is a different s