buryatia plans to build two solar power plants, this was reported in the regional ministry for the development of transport and energy roads . the total cost of the project will be about 6 billion rubles. the total capacity is 100 mw, the annual reduction of carbon dioxide emissions will reach about 74,000 tons. and on this i have more and more news already in next chat. that in life there is no place for a magical adventure? a walk through unexplored worlds that inspire new achievements, because in life there is always a place for impressions. you just have to open them. mfc more than 600 types of services are available to visitors regardless of registration on the spot there is even a medical room where you can undergo express medical examination, vitaly motorin saw everything 40 universal windows are available for more than 300 types of various services, 3 separate tables are reserved for entrepreneurs there are offices where visitors can indicate legal assistance on two floors of the new tula flagship mfc there is even a place for a public reception, where you can get advice from a variety of specialists in perso